Institutions & sensitive sites
Deliveries under access control, institutional consignees, specific procedures: some operations demand rigorous prior coordination. OTEX prepares each intervention with the receiving site.
What is included
01
Prior coordination
Contact with the site, slots, authorisations and access instructions.
02
Identified drivers
Identities and required documents transmitted before the intervention.
03
Procedures respected
Site protocols applied from receipt to sign-off.
04
Full traceability
Proof of delivery and report transmitted after the operation.
Need this service?
Describe your shipment: a costed reply within 24 business hours, with a dedicated contact.
